Preparation phase summarizes all the previous discussion points we had with the client and finalizes the estimate for the project. Within this time frame all the questions and unknown would be answered to proceed with the modular system manufacturing phase.
At this time client is required to make the initial payment and conclude the project details.
Technical Floor team will be available throughout this stage if any assistance is needed. Usually it takes 2-8 weeks for the modular system to be manufactured and shipped, depending on the size and location of the project.